COST ESTIMATION MODEL FOR HIGHWAY PROJECTS USING ANN
DOI:
https://doi.org/10.17102/v8002Abstract
Construction and maintenance works are carried out by contractors for a period of few months to few years. Those contracts show cost variations between the actual and estimated costs. For example, cost estimation of 3 out of 5 projects from 2015- 19 in Trashigang Dzongkhag have not only been underestimated but the actual costs are on average 27% higher than the estimated costs. Moreover, researches reveal that there are issues in cost estimation at the conceptual stage affecting the project progress and cost (Flyvberg, 2002). In this study neural network has been used to predict the actual cost based on the initial estimation and duration. During the study, it was discovered that the neural network demonstrated its usefulness as a tool for cost estimation and could be effectively employed by decision makers. However, it is important to note that the neural network is not designed to replace the entire cost estimation method. Instead, it should be regarded as one of the tools to be utilized alongside other methods when estimating costs.
Published
Versions
- 2023-06-19 (2)
- 2023-06-19 (1)
How to Cite
Issue
Section
License
Copyright (c) 2023 Zorig Melong- A Technical Journal of Science, Engineering and Technology
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
All articles published in Zorig Melong are registered under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. unless otherwise mentioned. The journal allows unrestricted use of articles in any medium, reproduction, and distribution by providing adequate credit to the authors and the source of publication.